Built 2026-10-19 (19 October 2026)

Portland Sewage Plt Threshold Days by Year

18 fixed thresholds counted per year at Portland Sewage Plt (USC00407359): hot days, frost, tropical nights and heavy rain, with the most days in a year.

Key Facts for Portland Sewage Plt Thresholds

  • Portland Sewage Plt: days with 10 mm (0.39 in) or more of precipitation in 65 years, most in 1972 with 59.
  • Portland Sewage Plt: days with 25 mm (0.98 in) or more of precipitation in 65 years, most in 1979 with 26.
  • Portland Sewage Plt: days with a maximum temperature at or above 30 C (86 F) in 64 years, most in 2018 with 107.
  • Portland Sewage Plt: days with a maximum temperature at or above 90 F (32.2 C) in 64 years, most in 2018 with 67.
  • 18 fixed thresholds have at least one qualifying day at Portland Sewage Plt.
64 years with a qualifying day
Days at or above 30 C (86 F) per year at Portland Sewage Plt Days per year at Portland Sewage Plt with a maximum temperature at or above 30 C (86 F), with the decade average as a line. The most was 107 in 2018. 0501001501956: 901957: 711958: 791959: 891960: 751963: 681964: 851965: 751966: 611967: 381968: 681969: 781970: 781971: 621972: 561973: 761974: 511975: 731976: 351977: 861978: 811979: 441980: 851981: 561982: 621985: 821986: 891987: 961988: 781989: 641990: 741991: 801992: 421993: 811994: 561995: 711996: 621997: 541998: 921999: 802000: 692001: 602002: 842003: 422004: 352005: 772006: 682007: 982008: 612009: 472010: 1012011: 822012: 762013: 492014: 742018: 1072019: 1042020: 782021: 642022: 822023: 662024: 842025: 832026: 801956196519721979198819952002200920192026
Days per year at Portland Sewage Plt with a maximum temperature at or above 30 C (86 F), with the decade average as a line. The most was 107 in 2018.
Days at or above 30 C (86 F) per year at Portland Sewage Plt
YearDaysDecade average
19569082.3
19577182.3
19587982.3
19598982.3
19607568.5
19636868.5
19648568.5
19657568.5
19666168.5
19673868.5
19686868.5
19697868.5
19707864.2
19716264.2
19725664.2
19737664.2
19745164.2
19757364.2
19763564.2
19778664.2
19788164.2
19794464.2
19808576.5
19815676.5
19826276.5
19858276.5
19868976.5
19879676.5
19887876.5
19896476.5
19907469.2
19918069.2
19924269.2
19938169.2
19945669.2
19957169.2
19966269.2
19975469.2
19989269.2
19998069.2
20006964.1
20016064.1
20028464.1
20034264.1
20043564.1
20057764.1
20066864.1
20079864.1
20086164.1
20094764.1
201010184.7
20118284.7
20127684.7
20134984.7
20147484.7
201810784.7
201910484.7
20207876.7
20216476.7
20228276.7
20236676.7
20248476.7
20258376.7
20268076.7
First to last qualifying date each year at Portland Sewage Plt For each year, a bar from the first to the last day at Portland Sewage Plt meeting 30 C (86 F). 1956: 5 May 1956 to 1 October 19561957: 12 May 1957 to 11 September 19571958: 16 May 1958 to 26 September 19581959: 1 May 1959 to 10 October 19591960: 23 April 1960 to 2 October 19601963: 22 April 1963 to 23 October 19631964: 21 April 1964 to 21 September 19641965: 23 April 1965 to 17 October 19651966: 8 May 1966 to 10 September 19661967: 20 May 1967 to 20 September 19671968: 2 May 1968 to 23 September 19681969: 22 May 1969 to 17 September 19691970: 30 April 1970 to 23 September 19701971: 20 April 1971 to 3 October 19711972: 26 May 1972 to 22 September 19721973: 4 June 1973 to 5 October 19731974: 4 April 1974 to 13 September 19741975: 22 May 1975 to 10 September 19751976: 10 June 1976 to 28 August 19761977: 16 April 1977 to 26 September 19771978: 22 May 1978 to 22 September 19781979: 11 May 1979 to 6 September 19791980: 29 May 1980 to 10 October 19801981: 6 June 1981 to 14 September 19811982: 13 May 1982 to 16 September 19821985: 21 April 1985 to 23 September 19851986: 26 April 1986 to 3 October 19861987: 21 April 1987 to 15 September 19871988: 5 April 1988 to 23 September 19881989: 25 April 1989 to 14 September 19891990: 2 June 1990 to 30 September 19901991: 18 May 1991 to 19 September 19911992: 16 June 1992 to 10 September 19921993: 9 May 1993 to 24 September 19931994: 24 May 1994 to 16 September 19941995: 11 April 1995 to 15 September 19951996: 10 May 1996 to 6 October 19961997: 19 May 1997 to 20 September 19971998: 14 May 1998 to 1 October 19981999: 3 June 1999 to 2 October 19992000: 19 May 2000 to 6 October 20002001: 11 April 2001 to 24 September 20012002: 19 April 2002 to 21 September 20022003: 16 June 2003 to 2 September 20032004: 9 May 2004 to 12 September 20042005: 12 May 2005 to 20 October 20052006: 15 April 2006 to 5 October 20062007: 1 May 2007 to 9 October 20072008: 1 June 2008 to 14 September 20082009: 25 April 2009 to 11 September 20092010: 6 April 2010 to 12 October 20102011: 10 April 2011 to 14 September 20112012: 3 April 2012 to 8 September 20122013: 18 April 2013 to 13 September 20132014: 5 May 2014 to 11 September 20142018: 4 May 2018 to 9 October 20182019: 9 May 2019 to 6 October 20192020: 17 May 2020 to 14 September 20202021: 23 May 2021 to 16 September 20212022: 21 May 2022 to 22 September 20222023: 15 May 2023 to 4 October 20232024: 16 April 2024 to 7 October 20242025: 15 April 2025 to 4 October 20252026: 23 March 2026 to 2 October 202619561966197419821992200020082019JanFebMarAprMayJunJulAugSepOctNovDec
For each year, a bar from the first to the last day at Portland Sewage Plt meeting 30 C (86 F).
First to last qualifying date each year at Portland Sewage Plt
YearFirst dateLast date
19561956-05-051956-10-01
19571957-05-121957-09-11
19581958-05-161958-09-26
19591959-05-011959-10-10
19601960-04-231960-10-02
19631963-04-221963-10-23
19641964-04-211964-09-21
19651965-04-231965-10-17
19661966-05-081966-09-10
19671967-05-201967-09-20
19681968-05-021968-09-23
19691969-05-221969-09-17
19701970-04-301970-09-23
19711971-04-201971-10-03
19721972-05-261972-09-22
19731973-06-041973-10-05
19741974-04-041974-09-13
19751975-05-221975-09-10
19761976-06-101976-08-28
19771977-04-161977-09-26
19781978-05-221978-09-22
19791979-05-111979-09-06
19801980-05-291980-10-10
19811981-06-061981-09-14
19821982-05-131982-09-16
19851985-04-211985-09-23
19861986-04-261986-10-03
19871987-04-211987-09-15
19881988-04-051988-09-23
19891989-04-251989-09-14
19901990-06-021990-09-30
19911991-05-181991-09-19
19921992-06-161992-09-10
19931993-05-091993-09-24
19941994-05-241994-09-16
19951995-04-111995-09-15
19961996-05-101996-10-06
19971997-05-191997-09-20
19981998-05-141998-10-01
19991999-06-031999-10-02
20002000-05-192000-10-06
20012001-04-112001-09-24
20022002-04-192002-09-21
20032003-06-162003-09-02
20042004-05-092004-09-12
20052005-05-122005-10-20
20062006-04-152006-10-05
20072007-05-012007-10-09
20082008-06-012008-09-14
20092009-04-252009-09-11
20102010-04-062010-10-12
20112011-04-102011-09-14
20122012-04-032012-09-08
20132013-04-182013-09-13
20142014-05-052014-09-11
20182018-05-042018-10-09
20192019-05-092019-10-06
20202020-05-172020-09-14
20212021-05-232021-09-16
20222022-05-212022-09-22
20232023-05-152023-10-04
20242024-04-162024-10-07
20252025-04-152025-10-04
20262026-03-232026-10-02

Every Fixed Threshold

Fixed thresholds at Portland Sewage Plt
ThresholdYears with a qualifying dayMost days in a yearYearLatest year days
30 C (86 F): Days64107201880
35 C (95 F): Days4823200713
40 C (104 F): Days2220122
90 F (32.2 C): Days6467201853
100 F (37.8 C): Days13820121
0 C (32 F): Ice days (max6432197816
0 C (32 F): Frost days (min63118196341
-10 C (14 F): Days with min6037196311
-20 C (-4 F): Days with min14519772
20 C (68 F): Tropical nights (min6392199863
25 C (77 F): Days with min15720101
10 mm (0.39 in): Days with 10 mm or more rain6559197223
25 mm (0.98 in): Days with 25 mm or more rain6526197911
50 mm (1.97 in): Days with 50 mm or more rain63919798
100 mm (3.94 in): Days with 100 mm or more rain13220252
200 mm (7.87 in): Days with 200 mm or more rain1119691
10 cm (3.9 in): Days with 10 cm or more snowfall15319691
25 cm (9.8 in): Days with 25 cm or more snowfall3119661

Years with under 90 percent of days observed are left out of the most days column. Threshold history at this station starts in 1956.

Download the Data

  • Data for Portland Sewage Plt threshold days by year: CSV or JSON. Field meanings are on the data page.

Source: NOAA National Centers for Environmental Information, Global Historical Climatology Network Daily (GHCN-Daily). Records are computed by World Extreme Weather Monitor and are not official NOAA products. (US Government open data (NOAA NCEI)) Data as of 2026-10-17 (17 October 2026). Threshold counts are computed by this site.

Data as of . Last revised (2026-10-17).